Sunday, February 16, 2014
Engine prep 14 hrs
The past two days I worked on prepping the engine for running. I hooked up my cabin heat box to the control knob. I adjusted and set the travel of the throttle cable. I installed the tank cover and gas tank plumbing. I intalled the permanent gas line and covered it in fire sleeve. I attached it to the motor mount to keep it away from the exhaust. I permanately installed the exhaust with the gaskets and torqued the nuts. I torqued all of the motor mount and engine bolts. I ran the crankcase vent and secured it. I installed misc cable ties to secure everything. I went over to a buddies who is helping with my seat and helped him.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment