Saturday, December 21, 2013

Alignment checks and fairings. 7 hours

Today I went and bought 30' of vinyl tubing and made a water level. A friend came over and we checked various points of the wings and horizontal stabilizer to ensure that both withs had the same angle of attack and were true with each other. I am happy with what we found. Everything looks to be in pretty good shape. After that I worked on one of the trailing edge wing to fuselage fairings. I completed that one and moved to the other wing. I mounted the aileron and started forming the fairings for the other side over a pipe. I clecoed the upper fairing to the fuselage then started mounting the lower one and trimmed.

No comments:

Post a Comment