Tuesday, November 27, 2012

Control stick assembly 2 hours

The last two nights I have worked on the stick assembly. I had my parts welded at work and took them to a buddy with a milling machine. We drilled out the two 5/8 holes then milled out the area between them. Then we drilled the 3/16 hole that serves as the pivot point. My bushing came in today so we drilled the horizontal part of the stick assembly to 19/64(1/64 under the size of the bushing). We pressed the bushing into the hole then reamed the ID to 3/16 and filed the bushing down to the pipe. Very happy with how all of this turned out! Thanks Greg!





No comments:

Post a Comment