Monday, November 25, 2013
More wiring. 4 hours
The past few days I've worked on my wiring. I have got all of my wiring roughed in. Now I've taped the harness together and have removed it from the plane where I will wrap it with a spiral wrap to keep it all together.
Wiring 2 hrs
Tonight I worked on wiring. My plan is to get all, or the majority of my wires ran, and put them together as an assembly, or harness. Right now I am just routing wires, cutting, and tagging. Looks like a mess now but it will be nice clean when I get done with it. Already figured out I'm going to need about 5 times the wire I thought.
Tuesday, November 19, 2013
Instrument panel 4 hrs. 447 total hrs
The past couple of nights I've worked on laying out the instrument panel. I've also ordered some wiring materials which should be here tomorrow. I'm tired of working on stuff with no real tangible result and looking forward to the instrument panel and wiring work.
Misc 4 hour
I have spent the past several times working on the plane on misc items. Tying up loose ends and doing little things that don't amount to much, but have to be done
Sunday, October 27, 2013
Fairings, wing walks, misc. 6 hrs
Tuesday, October 22, 2013
Wing walks. Stabilizer fairing. 4 hrs
Subscribe to:
Posts (Atom)

































