Sunday, November 18, 2012

Bulkheads. 2 hours

Today I worked on f8 and f9 bulkheads. I cut both bulkheads out and drilled ,notched, and deburred f8. Time consuming! I think I'll make all bulkheads before moving any further with fuselage construction

Friday, November 16, 2012

Misc fuselage work. 2 hrs

Tonight I installed the other angle that goes from f3 to f5 and bolted the firewall to the upper longerons. I also installed the gussets on the upper longerons and rivets f3 to the angle.

Thursday, November 15, 2012

F3and f5 bulkheads 4 hours

The past few nights I've worked on the f3 and f5 bulkheads. I had to remake one of the f3 bulkheads because I bent both of them the same way. I also installed the angles at f3 and the diagonal angle from the aft portion of the landing gear to f5

Sunday, November 11, 2012

F6 bulkhead upper longeron 7 hours. 177 total hours

Today I cut, deburred, and riveted f6 bulkhead. I also fabbed one of the upper longerons and both upper gussets.

Saturday, November 10, 2012

Lower longerons etc 8 hours

I remade one of the lower longerons and both of the attachment feet. I mounted the firewall to the lower longerons and cut the blanks out for bulkhead f6.

Wednesday, November 7, 2012

Lower longerons. 4hours

The last two nights, I cut the angles, drilled the bending holes and bent the lower longerons offsets and fabbed the attachment angles. I drilled the attachment angles and bolts them to the lower front longerons. I need to come up with a countersink bit now to countersink the screws that attach the attachment angles to the lower front longerons. I also cut the remaining form blocks for the fuselage bulkheads. All of my fuselage bulkhead forming blocks are now cut.

Saturday, November 3, 2012

Bulkhead forming blocks 5 hours

Today I worked on the forming blocks
For the bulkheads. Last night I
Drilled and deburred the bottom
Center section skin and it's ready for riveting. I'm about 80% done with the forming blocks