Wednesday, November 7, 2012

Lower longerons. 4hours

The last two nights, I cut the angles, drilled the bending holes and bent the lower longerons offsets and fabbed the attachment angles. I drilled the attachment angles and bolts them to the lower front longerons. I need to come up with a countersink bit now to countersink the screws that attach the attachment angles to the lower front longerons. I also cut the remaining form blocks for the fuselage bulkheads. All of my fuselage bulkhead forming blocks are now cut.

No comments:

Post a Comment