Saturday, March 1, 2014

cowl inlet/paint prep 8 hrs

today I installed the carb air inlet on the front of the cowling.  I also disassembled the tail and scotchbrited  the rest of the airplane.  The fuselage was already done, and I did the horizontal stabilizer and the wings.  I cut my opening for the static/pitot tube.  After roughing the entire airplane up with scotch brite, I took everything outside and washed it with dawn dish detergent.  I am very sore from all of the scrubbing but got a lot done today

No comments:

Post a Comment